Depot Lighting Feasibility Study
Frankham were appointed by Arriva Traincare to undertake a a set of feasibility studies that would establish the options available to upgrade or replace the existing general and emergency lighting to several Arriva Traincare depots.
The feasibility studies were carried out at the following Arriva Traincare depots:
- Bristol
- Cambridge
- Crewe
- Eastleigh
As part of the study, we undertook site surveys to identify the extent, type and condition of the existing lighting systems. These surveys enabled proposals to be developed and budget estimates to be calculated.
We put forward a set of recommended solutions for the client and stakeholders to review and make an informed decision as to which option to proceed with.
Client:
Arriva Traincare
Services:
Building Services
Electrical