HCE, Review, Assessment and Design
Frankham was initially commissioned to undertake a Hidden Critical Element (HCE) examination for Platform 1 and associated canopy and superstructure of a major London railway station.
In response to identifying a number of urgent defects, additional services were provided to support our client and the end client. The in-house activities undertaken by Frankham for the study comprised:
- Hidden Critical Element (HCE) Examination.
- Contractors Responsible Engineer Design (CRE-D).
- Lead Designer – Design coordination.
- Trackside coper support inspection and temporary works design.
- Corrosion inspection and section loss survey using Ultrasonic Thickness Gauge (UTM) device.
- Combination of inspection techniques to compile the Inspection for Assessment (IFA).
- Design of replacement support-beam.
- Level 1 and 2 assessment of platform support structure.
- Design Assurance Forms.
- Site query support.
- Designer’s Risk Assessment.
- Working for the contractor on this project whose client was the main asset owner.
Client:
Octavius
Services:
Infrastructure Engineering