Frankham were appointed to provide end-to-end inspection, assessment, and civil engineering design services for the replacement of the Station Road Bridge over the New River.

Client
  • London Borough of Haringey
Location
  • Haringey
Sector
Project Focus

We were asked to undertake an assessment of the structure for highway loading. An Inspection for Assessment was undertaken and an Assessment.

These identified that the structure had passed its design life, as such London Borough of Haringey (LBH) decided in 2015 to progress with the bridge replacement option as a long-term solution.

Frankham, having already undertaken the Assessment, were asked to provide some feasibility work and determined a solution for a replacement deck on existing foundations. New bearing shelves were designed with associated bridge bearings.

In addition, we provided services to provide a design and advice for the services diversions, traffic management and temporary works, including a temporary bridge. We also acted as designer and Principal designer for the project under CDM, including advice and support to the site team. Frankham provided end-to-end inspection, assessment and replacement design for this structure.